15+ Years of Excellence

OEM/ODM Toy Manufacturing

From concept to production: Industrial design, prototyping, tooling & injection molding, finishing & assembly, quality compliance & global delivery. Get your quote draft in 48 hours!

CE • FCC • CPC • RoHS • REACH 8 Production Lines • OEE 85%+ NDA Protected • Third-party Labs
7-10 Days
Prototyping
25-35 Days
Production
AQL 0.65/1.0
Quality Level

Capabilities Overview

Materials/Process
ABS • PC • PP • TPE
Multi-color • Hot Runner
Quality System
IQC • IPQC • FQC • OQC
SPC • MSA
Certifications
EN71 • CE • FCC • CPC
RoHS • REACH
Logistics
FOB • CIF • DDU • DDP
Multi-warehouse

Our Services

Six core service modules covering the entire process from design to global delivery

Industrial & Mechanical Design

Aesthetic & ergonomic design, DFM/DFS review, material selection, and manufacturability assessment.

DFM Review Material Selection 3D Modeling

Rapid Prototyping

CNC, SLA, SLS, vacuum casting with painting, appearance/functional prototypes.

3-7 Days Color Matching Assembly Test

Tooling & Injection Molding

Single/multi-color/overmolding, hot runner, mirror/texture finish, mold flow analysis.

Hot Runner Multi-color PPAP Available

Surface Finishing & Assembly

Painting, pad printing, hot stamping, ultrasonic welding, silk screen, laser engraving, EOL testing.

ΔE ≤ 1.0 Adhesion Test Torque Control

Quality & Compliance

EN71, CPC, CE, FCC, RoHS, REACH compliance with full AQL/SPC/MSA process control.

Traceability 3rd Party Testing CoC/SDS

Supply Chain & Logistics

BOM optimization, procurement, multi-warehouse transit, FOB/CIF/DDU/DDP international logistics.

Delivery Guarantee Multi-channel Compliant Labels

Industrial & Mechanical Design

Deliverables: Concept designs, 3D/2D drawings, exploded views, risk assessment. Timeline: 3-10 working days.

What We Do

  • Aesthetic/ergonomic design and style definition
  • DFM/DFS manufacturability review and risk assessment
  • Material selection and structural reinforcement
  • Assembly process evaluation and tolerance allocation
DFM BOM Draft Exploded View

Quantifiable Results

  • Part count optimization: 10-30%
  • Assembly time reduction: 8-15%
  • Drop test/torque validation for critical points

Trust & Certifications

Global standards compliance and quality assurance

ISO
9001
EN71
Safety
CE
Mark
FCC
Certified
CPC
Compliant
RoHS
Directive
REACH
Regulation

Frequently Asked Questions

What is your MOQ (Minimum Order Quantity)?

Depending on the process and SKU, typically 500-3000 pieces. We can evaluate small batch trial production and flexible scheduling.

Do you support OEM/ODM and private labeling? Can you sign NDA?

Yes, we support both OEM/ODM and brand customization. We provide mutual NDA and support third-party laboratory testing.

What are the lead times for samples and production?

Engineering samples: 7-10 days; Mass production: 25-35 days (depending on SKU/tooling and material availability).

Get Your 1-Hour Quote

Contact us for free samples!

Contact Information

Email: sales@toyvao.com
WhatsApp: +86 186 8106 4480
Response time: Within 1 hour!
Scroll to Top